Why Custom
Generic simulators are built for an organization that doesn’t exist
A device built around your syllabus earns more training credit, fits your room and stays useful as your fleet changes. Requirements come first, then the device.
| Off-the-shelf | Built for you | |
|---|---|---|
| Cockpit layout | Generic panel you train around | Laid out around your syllabus and procedures |
| Certification | Worked out after purchase | Scoped from the first meeting |
| Training credit | Limited to what the device happens to support | Designed to the qualification level your courses need |
| Fleet changes | A cockpit that no longer matches | Modular panels that reconfigure with the fleet |
Why Virtual Fly
- 30+ Custom devices delivered Engineered for ATOs, universities and academies worldwide.
- 15 yrs Certified simulator design The people scoping your device are the people who build it.
- 1 roof Design, build, software Mechanical, electronics and software teams in Barcelona.
- 0 Resellers in between Direct with the manufacturer on price, lead time and changes.
What We Customize
Every layer, one roof
In-house teams design each layer from the same specification and the same 3D model, so mechanical, electrical and software decisions are made together.
0–2
Discovery & requirements
We sit down with your head of training and chief instructors to map the syllabus, aircraft type, regulator and target qualification level. A site survey confirms space, power and network.
What we do
- Training needs workshop
- Aircraft reference data collection
- Regulatory target and qualification level
- Site survey: space, power, network
Your team provides
- Syllabus and training volumes
- Aircraft documentation or aircraft access
- Facility access
Deliverables
- User requirements specification
- Facility requirements
2–4
Feasibility & concept
We first check whether a configured standard device covers your requirements. Where it does not, our engineers scope the custom elements and present a concept.
What we do
- Gap analysis against standard devices
- Concept cockpit layout
- Visual system and field-of-view sizing
- Motion and feasibility review
Your team provides
- Priorities and must-haves
- Instructor input on the concept
Deliverables
- Concept proposal
- Custom scope list
4–5
Proposal & specification
A fixed technical specification, qualification plan, price and schedule, reviewed with your team until it matches the brief.
What we do
- Technical specification
- Qualification plan
- Week-by-week master schedule
- Commercial terms
Your team provides
- Specification review and approval
- Purchase order
Deliverables
- Signed specification
- Project plan and schedule

5–11
Engineering design
Mechanical, electronics and software engineers design the device from one shared 3D model: cockpit geometry, structure, wiring, I/O and instructor station layout.
What we do
- Shared 3D cockpit model
- Structure, wiring and I/O design
- Flight model and IOS software
- Design review with your instructors
Your team provides
- Feedback on layout, ergonomics and IOS workflow
- Lesson plans and scenarios to preload
Deliverables
- 3D cockpit walkthrough
- Electrical and I/O schematics
- Design review pack
9–19
Manufacturing
Structure, panels, controls and electronics are produced in our own facility, so tolerances, finish and lead times stay under one roof.
What we do
- Structure and shell fabrication
- Panel machining and backlighting
- Harness and electronics assembly
- Avionics and visual system integration
Your team provides
- Optional factory visit to review the first article
Deliverables
- Build progress reports
- First-article inspection
- Component traceability records

19–21
Quality control & FAT
The complete device is tested at our facility against the requirements specification and the qualification test guide, with your instructors flying it before it ships.
What we do
- Component and burn-in testing
- Flight model validation against aircraft data
- QTG test runs
- Factory acceptance test (FAT)
Your team provides
- Instructors attend and fly the FAT
Deliverables
- FAT report
- QTG results
- Punch list and close-out

21–23
Crating & shipping
The device is crated in modules and shipped with full export documentation and insurance, timed to your site being ready.
What we do
- Modular crating
- Export and customs documentation
- Freight and insurance
- Delivery scheduling with your site
Your team provides
- Site readiness confirmation
- Access and unloading arrangements
Deliverables
- Shipping documents
- Installation schedule

23–25
Installation & SAT
Our technicians assemble, calibrate and commission the device at your facility, then run the site acceptance test.
What we do
- On-site assembly
- Visual alignment and calibration
- Network and instructor station setup
- Site acceptance test (SAT)
Your team provides
- Room, power and network ready
- IT contact on site
Deliverables
- SAT report

25–26
Training & qualification
We train your instructors and technicians and support the authority evaluation until the device is qualified.
What we do
- Instructor station training
- Maintenance training
- Authority evaluation support
- Handover documentation
Your team provides
- Staff available for training
- Scheduling the authority evaluation
Deliverables
- Operator and maintenance manuals
- Qualification support pack
- Support contract

Certification
Built to be qualified
We design each device against the standard your authority will evaluate it under, and prepare the documentation that evaluation requires. Qualification work runs through the process:
Qualification is granted by the authority to the operating organization. Virtual Fly delivers the compliant device, supports you through the process and handles recurrent checks after handover.
FAA
United States
- BATD Basic aviation training device · AC 61-136
- AATD Advanced aviation training device · AC 61-136
- FTD Flight training device · 14 CFR Part 60
EASA
Europe
- BITD Basic instrument training device · CS-FSTD(A)
- FNPT I Flight & navigation procedures trainer
- FNPT II / MCC Including multi-crew cooperation

Featured project · European ATO
Diamond DA42 FNPT II MCC
The ATO needed a twin-engine trainer for its ME/IR and MCC courses, sized for an existing classroom and ready before the next intake. We modelled a two-seat cockpit from DA42 reference data, built it in-house, and the authority evaluated it as FNPT II MCC.
- Aircraft Diamond DA42
- Standard EASA FNPT II MCC
- Delivery 26 weeks
- −22% Type-rating aircraft hours
- 0 Open findings at evaluation

Aviation University · Nordics
Cessna 172 lab, 3 devices
A three-station FNPT II lab on a shared network, sequencing ab-initio classes through identical cockpits.
×3 networked

US Community College
Piper PA-28 AATD
FAA AATD procedural trainer feeding a degree program, with results piped into the college LMS.
120 students / term

National Flight Academy
Beechcraft King Air FTD
Turboprop flight training device engineered for continuous daily rostering across two shifts.
2-shift daily use
Start a Project
Scope your organization’s device
Tell us your aircraft, regulator and training goals. An engineer replies within two business days with a tailored proposal — no reseller in between.
- One dedicated engineer A single point of contact from brief to install.
- Reply within 2 business days A tailored proposal for your aircraft and regulator.
Request a custom consultation